In the village Aksubaevo completes the repair of the road and street network

15 June 2015, Monday

Asphalt  8 445 thousand square meters of roads in the streets of Lenina, Mazilina, Engel'sa, Oktyabr'skaya and Zolina.

There are sidewalks on the area of 88 square meters, installed 591 meter curbs. Also built 15 exits from the streets with a total area of 1278 sq. m, equipped bus pavilion on the Mazilina street. And on the Oktyabr'skaya built car Parking. The entire length of the repaired streets will be installed 16 road signs.

SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International