Completed construction staging sites on the Baturin and Sibgat Khakim streets. On the Sibgat Khakim street the light is installed, equipped with 2 autopoweron which are connected to stopping the pockets for the arrival of public transport. On the Baturin street appeared one equipped with a stopping area with automobiledom.
For the organization of safe traffic on these streets 39 set of road signs.