In the metro area Kukmor RT restored worn upper layers of coating on the road Sardek-Bash - Lelvizh - Chura village. On a stretch of 1,500 meters made patching. It is a road with a total length of 11 kilometers belongs to the fourth category - two-lane width of 3 meters each.
Patching in the area carried out on an area of 5,800 square meters - 70% of the target. Used 850 tons of asphalt. Replaced and installed 400 signal bars.
Maintenance of roads in the area engaged Kukmor "Tatautodor."