Put into operation after the reconstruction bridge over the river near the village of Yingchao Sikterme-Huzangaevo in the Alkeevsky municipal area.
Reconstruction of the bridge began in December 2013. During the works have also been installed barrier fencing, paved approaches length of 200 meters. The bridge is now 29.2 meters, width - 6.5 meters.