Metro area in the Sabine complete reconstruction of the road "Kazan-Shemordan" - Korsabash - Sule".
Road length of 4225 meters was built according to the standards of the road V technical categories - one lane width of 4.5 meters and is covered with a single layer of asphalt. Road interconnected two settlements - villages Korsabash and Sule.
Designer works was Agrotransproekt Institute. General contractor - "Tatautodor".